20

2026

-

08

Sunfire Begins Building Megawatt-Scale SOEC Plant at BASF Site With Eye on 89% Efficiency

Author:

FuelCellsWorks


  • German electrolyser maker Sunfire has started construction on a pilot project demonstrating 1.3MW of solid-oxide electrolyser cells (SOEC) at BASF's Industriepark Lausitz in Schwarzheide, eastern Germany.
  • The facility will validate Sunfire's latest, most powerful SOEC generation in an industrial setting, using waste heat from the park, with operations scheduled to begin next year.

 

Sunfire GmbH has officially broken ground on a Solid Oxide Electrolysis Cell test facility at BASF's Industrial Park Lausitz, a chemical and industrial hub in Schwarzheide, Brandenburg. The groundbreaking ceremony took place Wednesday, as announced by BASF InfraService & Solutions Lausitz GmbH, which operates the site. The Dresden-based company plans to validate its newest and most powerful SOEC product generation under real industrial conditions, having increased the capacity per individual core unit to megawatt scale.

 

The plant will produce hydrogen through electrolysis, which normally splits water into hydrogen and oxygen using electricity. To cut electricity use and lower the traditionally cost-intensive process, the test system will use water vapor rather than liquid water. SOEC technology runs at high temperatures of around 850 degrees Celsius and reaches electrical efficiencies of up to 89% LHV, AC. To heat the water, Sunfire will draw on waste heat from the industrial park, while the hydrogen produced can be used by the park itself.

 

Sunfire CEO Nils Aldag said that while the company's pressurised alkaline electrolysers are already deployed in large-scale industrial projects across Europe, it also views high-temperature electrolysis as a critical enabler of the energy transition, with the potential to become another key technology for industrial decarbonisation.

 

CTO Christian von Olshausen added that validating the technology under real industrial conditions completes the final steps before the company implements its first commercial projects.

 

Sunfire says the facility is meant to further advance the commercialization of hydrogen production, testing the process in Schwarzheide for wider use on the market. The test facility is scheduled to go into operation next year.

 

Source:FuelCellsWorks

Hot News

FuelCellChina Interviews